繁體中文 GLOBAL SITES
簡體中文  
English  
   
Bridge / Viaduct
Freeway / Highway
High Speed Rail / Railway
Mass Rapid Transit
Airport
Building Structures
Land Development  
Construction Management / Supervision
Inspection / Evaluation & Retrofit
Environmental Engineering
Water Resources / Soil Conservation  
Landscape Engineering / Landscap Lighting
 
 
 
 
 
 
 

Water dispatching pipe and Guangfu pumping and pressurized station (first phase) project
Water dispatching pipe and Guangfu pumping and pressurized station (first phase) project


Product Description

The "Planned Phase II Project of Bohai New Area Water Supply Improvement Project" implemented the "Joint Dispatch of Water Supply" mechanism between Xindian Creek and Tai Han River Water Supply to meet the demand of the new plate area. The project content was approved in addition to the second original of Xindian Creek in Taipei Waterworks Division The water diversion route and the expansion of the sixth water purification site at Cheong Tam and due to the inability of the existing water supply equipment to deliver water supply areas newly added to the Phase II Project and the additional deployment of mains and pressurization facilities. This project mainly belongs to the water dispatch mains system, in which the water mains dispatching mains from the North Water Department water point (Yongfu Bridge support point) to the light water pumping pressure station, the Department of gravity water, to the light pumping station pressurized below Mining pressure water supply. After the completion of this stage, the maximum daily water supply of the light recovery pumping station is 300,000 CMD. The pressurized water will be delivered to Dahan Bridge to connect the existing water pipe bridge 1350mm pipeline and the new Qionglin over-river pipeline to supply Xinzhuang, Taishan water supply area.

Client:Taiwan Water Corporation
Water Scheduling Mains Length:Tap water pipe ø2200,ø2600mm diameter digging and promotion, the entire length of about 12.5km (including Guangfu pumping pressurized station building)
Location:Located in the left bank of Xindian Creek and Dahon Creek area
Construction Fees:2.6 billion
Dates:2013.08~2018

   

 

 
TYLin_Logo_White.png
ABOUT TYLIN
NEWS
SERVICE
PROJECTS
CAREER
CONTACT US
© Copyright 2011 T.Y.Lin Taiwan Consulting Engineers.inc.

Founder

Company Profile

Organization Chart

Philosophy

Group Distribution

Certification

Awards

Bridge / Viaduct

Freeway / Highway

High Speed Rail / Railway

Mass Rapid Transit

Airport

Building Structures

Land Development

Construction Management / Supervision

Environmental Engineering

Water Resources / Soil Conservation

Landscape Engineering / Landscap Lighting

Bridge / Viaduct

Freeway / Highway

High Speed Rail / Railway

Mass Rapid Transit

Airport

Building Structures

Land Development

Construction Management / Supervision

Inspection / Evaluation & Retrofit

Environmental Engineering

Water Resources / Soil Conservation

Landscape Engineering / Landscap Lighting

Urban Planning

BIM(Building Information Modeling)