繁體中文 GLOBAL SITES
簡體中文  
English  
   
Bridge / Viaduct
Freeway / Highway
High Speed Rail / Railway
Mass Rapid Transit
Airport
Building Structures
Land Development  
Construction Management / Supervision
Inspection / Evaluation & Retrofit
Environmental Engineering
Water Resources / Soil Conservation  
Landscape Engineering / Landscap Lighting
 
 
 
 
 
 
 

Water Reclamation Center, Hsinchu City
Water Reclamation Center, Hsinchu City


Product Description

The establishment of Water Reclamation Center is not only to purify the water quality of Ke-Ya River ,avoid the mosquito, improve the environmental sanitation,promote fishery business but also to give back to Hsinchu City a fresh hydrophile living space and to ensure the living quality to the citizens. To create Hsinchu City become an international city is critical in this program. This is a turn-key project that the main construction includes the Water Reclamation Center and recover 17.2 hectare of reclaimed land. Water Reclamation Center has set up in four periods of construction stage; first of all, is to design the amount of 30,000CMD of daily average waste water treatment which will increase amount to 130,000CMD by the end of overall stage. The main processing system is focused on Activited Sludge Treatment and Sand Filter Treatment.
 
Before filling the earth, the elevation of original ground surface is EL.+1.5m~2.5m, storm tide level is about EL.+3.5m. According to the basic design requirment, the fill elevation is controlled on +4.7m above sea level which is higher than 1.2m to the storm tide level. The refill method is to use the enclosure embankment, the earth resource is coming from the Hsinchu fishery port located at the north side of Water Reclamation Center. The average transport distance is about 7.7 km. Soil texture is mainly silty sand. In behalf of soil liquefaction and rifill earth consolidation settlement induced by earthquake. All sandy layer by using dynamic compaction combine with compaction sandy piles to process soil improvement. These technics are  necessary to achieve the design requirment.
 
Client : Construction & Planning Administration,  Ministry of Interior 
Location : Hsinchu City
 

 

 
TYLin_Logo_White.png
ABOUT TYLIN
NEWS
SERVICE
PROJECTS
CAREER
CONTACT US
© Copyright 2011 T.Y.Lin Taiwan Consulting Engineers.inc.

Founder

Company Profile

Organization Chart

Philosophy

Group Distribution

Certification

Awards

Bridge / Viaduct

Freeway / Highway

High Speed Rail / Railway

Mass Rapid Transit

Airport

Building Structures

Land Development

Construction Management / Supervision

Environmental Engineering

Water Resources / Soil Conservation

Landscape Engineering / Landscap Lighting

Bridge / Viaduct

Freeway / Highway

High Speed Rail / Railway

Mass Rapid Transit

Airport

Building Structures

Land Development

Construction Management / Supervision

Inspection / Evaluation & Retrofit

Environmental Engineering

Water Resources / Soil Conservation

Landscape Engineering / Landscap Lighting

Urban Planning

BIM(Building Information Modeling)