The public work for the Neihu Area Fifth Replanning District is part of Taipei City Neihu Area Replanning Project. Of which, the sewerage system serving the wastewater catch basin covers an area around 42.32 ha. The planned wastewater flow is 22,470 CMD. Content of the project are: 300m/m PVC pipe with a length of 2,220m, 400m/m RCP pipe with a length of 1,255m, 500m/m RCP pipe with a length of 515 m and 600m/m RCP pipe with a length of 150 m. Quantity of precast manhole is 45 sets. The piping layout follows generally the contour of the ground level in the catch basin, and connects to the existing sewerage system of Neihu area.
Founder
Company Profile
Organization Chart
Philosophy
Group Distribution
Certification
Awards
Bridge / Viaduct
Freeway / Highway
High Speed Rail / Railway
Mass Rapid Transit
Airport
Building Structures
Land Development
Construction Management / Supervision
Environmental Engineering
Water Resources / Soil Conservation
Landscape Engineering / Landscap Lighting
Inspection / Evaluation & Retrofit
Urban Planning
BIM(Building Information Modeling)