This turnkey project is planned to be constructed as a connecting passage and ecological green corridor in Nangang. Utilized the 800m template section as the platform to connect the second and first floors, together with the platform and its facilities, Nangang Green Corridor embodies the concepts of ecology and resilient city. Nangang Station as the center, connected three MRT stations with a pedestrian passage of nearly 3.56 km and builds an ecological green corridor on Civic Boulevard.
The construction cost is NT$ 412 million including an 800m length of road, a 95m steel structural pedestrian bridge (7.5m vertical height and 4.5m horizontal width) landscaping, electrical equipment, lighting, pipelines, light-current system, traffic maintenance and other specified works. |